Property leadership topic

Operations and maintenance

Trace service requests and maintenance work from intake to tested completion.

A connected decision sequence

Use the guides in the order that matches your current decision. Keep the evidence, approval, and next action connected as work moves between the board, management, vendors, and specialists.

  1. Establish an operating baselineWhich assets or services are critical?
  2. Map assets and resident service workflowsWhat does verified completion look like?
  3. Report exceptions and test recoveryWhere does work wait without an accountable owner?
Packaged heating and air-conditioning units on a rooftop
Rooftop HVAC equipment, photographed August 2009. Equipment example; location is not identified as a TrustPoint property. Photo: P199 · Public domain. Resized and converted to WebP; displayed with a responsive editorial crop.

Guides in this topic

Build the decision record

For the issue in front of you, name the responsible sponsor, collect the current source records, list material gaps, and identify the acceptance test. Retain a version of the evidence used at the decision date so later changes remain explainable.

These resources provide operational frameworks. Property-specific technical conclusions, deadlines, funding authority, and coverage decisions need the applicable records and appropriate professional review.

Find downloadable resources

Need help connecting the evidence and the decision?

Discuss a focused review