Asset register
Create a controlled list of maintainable assets, locations, responsibilities, condition, criticality, related documents, and replacement planning references.
Connect every critical asset to a task, frequency, responsible owner, completion record, finding, and corrective action—then show leadership what is slipping before failure decides the priority.
A useful preventive maintenance plan answers seven questions: what asset, where, who owns it, what task is required, when it is due, what proves completion, and what happens when the result is unacceptable.
Begin with life-safety, water-control, electrical, vertical-transportation, access, structural, fire, and continuity systems. Add manufacturer, warranty, contract, inspection, and professional requirements. Then expand to service-quality and appearance assets.
Create a controlled list of maintainable assets, locations, responsibilities, condition, criticality, related documents, and replacement planning references.
Define the inspection, cleaning, lubrication, testing, servicing, calibration, treatment, and replacement tasks associated with each asset.
Record why each task is daily, monthly, seasonal, annual, usage-based, or condition-based: law, code, manufacturer, warranty, contract, specialist, or site experience.
Plan labor, vendors, parts, access, permits, shutdowns, resident notice, safety controls, approvals, and dependencies before the due date.
Require date, technician, readings, checklist, photographs where appropriate, findings, parts, exception notes, and reviewer acceptance before closure.
Convert failed inspections and abnormal readings into prioritized work with an owner, target date, interim control, cost path, and verification.
A score helps sort work; it does not override qualified judgment, mandatory inspection or maintenance requirements, emergency conditions, or manufacturer and warranty instructions.
| Cadence | Review | Output |
|---|---|---|
| Daily or weekly | Critical alarms, leaks, life-safety exceptions, access, active shutdowns, overdue critical work, and vendor mobilization. | Immediate control, escalation, and assigned corrective action. |
| Monthly | Scheduled-versus-completed work, repeat issues, open findings, backlog age, parts constraints, vendor service, and emergency work. | Exception report with owners and dates. |
| Quarterly | System trends, condition changes, contract performance, shutdown planning, budget effects, capital dependencies, and seasonal readiness. | Updated risk and priority plan. |
| Annually | Asset register, task basis, frequencies, warranties, contracts, replacement links, staffing, tools, and next-year budget. | Approved annual plan and resource forecast. |
| After an event | Failure, storm, incident, inspection finding, renovation, manufacturer notice, or material operating change. | Root-cause review and revised task or control. |
“Completed” is not a useful status when the record does not identify the asset, task, result, exception, and next action.
State the asset or location, observed condition, priority reason, requester, date, access needs, and any immediate control already in place.
Name the responsible team or vendor, target date, scope, approval, parts, safety requirements, resident notice, and escalation contact.
Record arrival, work performed, readings, materials, photographs when appropriate, deviations, and any additional condition discovered.
Confirm function, cleanup, access restoration, documentation, warranty effect, invoice match, and acceptance by the appropriate reviewer.
Create separate owned work for deferred repairs, parts, monitoring, engineering questions, proposal requests, or capital planning.
Update failure codes, task instructions, frequency, inventory, vendor expectations, training, budget, and replacement assumptions.
A small dashboard is more useful than dozens of counts. Start with preventive work ratio, schedule completion, repeat issue rate, work-order cycle time, backlog age, inspection closure, emergency work, and critical-system test completion.
Define every formula, source, owner, cadence, and limitation. Segment results by asset class, priority, internal versus vendor work, and cause before drawing conclusions.
Identify maintainable assets, locations, responsibilities, condition, criticality, required tasks, frequency, instructions, safety or access needs, labor or vendor ownership, parts, evidence of completion, findings, and corrective follow-up.
Review execution monthly, priorities and backlog quarterly, and the full asset and task basis at least annually. Also reassess after a failure, inspection, project, warranty change, storm, or material change in use or condition.
Preventive work is planned to inspect, service, test, or replace an asset before failure. Reactive work responds after a fault, complaint, damage, or service interruption. Both should remain visible in the same operating picture.
No. Frequencies and methods must follow applicable law, codes, permits, manufacturer instructions, warranties, contracts, specialist recommendations, and site-specific risk.