Make emerging risk visible before it becomes an incident.
A property risk register connects early warning signs, evidence, controls, ownership, review cadence, and escalation so boards and management can act before uncertainty turns into avoidable loss.
A risk register is a decision system, not a list of fears.
Useful registers describe a plausible event, the conditions that make it more likely, the property consequence, current controls, evidence of control performance, and the next decision.
The register should be short enough to review and detailed enough to assign. It does not replace the work-order system, inspection report, incident file, budget, insurance review, or professional opinion. It links those sources into one leadership view and makes gaps explicit.
Move from observation to accountable treatment.
- IdentifyUse inspections, work trends, claims, complaints, budgets, contracts, projects, incidents, staff knowledge, and specialist reports to capture credible uncertainty.
- DescribeWrite the cause, event, and consequence in plain language. Avoid labels such as “roof risk” that do not explain what decision is needed.
- VerifyLink the current condition and controls to records, photographs, tests, logs, contracts, professional findings, or direct observation.
- AssessConsider life safety, legal or contractual exposure, service interruption, financial magnitude, stakeholder harm, speed, detectability, and reversibility.
- TreatChoose to avoid, reduce, transfer, monitor, or knowingly accept the risk within valid authority. Name one owner and a target date.
- EscalateDefine the condition that moves the item to emergency action, specialist review, board decision, insurer notice, or another required channel.
- CloseRequire evidence that the treatment was completed and effective. Record remaining exposure rather than declaring the risk gone without support.
Start with credible indicators and evidence.
These are prompts for local evaluation, not a claim that every risk exists at every property. Add property-specific causes, impact, likelihood, control effectiveness, target dates, and specialist direction.
61 risks shown
| Domain and risk | Indicator and evidence | Baseline control | Owner and escalation |
|---|---|---|---|
| Life safetyFire protection impairment | Open deficiency or disabled componentReview: Inspection reports impairment notices work orders and fire-watch records | Maintain an impairment log responsible person temporary protection and verified restoration | Facilities lead · Immediate and monthlyEscalate: Required protection is unavailable or restoration lacks confirmation |
| Life safetyBlocked egress | Repeated obstruction or door defectReview: Walkthrough records photographs access logs and work orders | Inspect routes and doors document correction and prevent recurrence | Property manager · WeeklyEscalate: Exit route or door cannot serve its intended function |
| Life safetyElevator entrapment pattern | Repeat calls or unresolved faultReview: Service tickets callback history inspection record and resident reports | Trend callbacks verify required service and escalate repeat faults | Property manager · MonthlyEscalate: Repeat entrapment or safety-related fault remains unresolved |
| Life safetyPool or amenity safety gap | Missing barrier record test or supervision controlReview: Inspection logs access records vendor reports and incident history | Use opening checks documented testing and immediate closure criteria | Amenities lead · Daily in seasonEscalate: Safety control is missing failed or undocumented |
| BuildingWater intrusion progression | New stain odor moisture or repeated leakReview: Moisture readings photographs work orders and professional reports | Track source extent temporary control investigation and permanent repair | Facilities lead · Weekly until closedEscalate: Active intrusion reaches occupied electrical or structural area |
| BuildingEnvelope deterioration | Cracking spalling failed sealant or corrosion trendReview: Inspection reports photo log repair history and specialist recommendations | Maintain condition register priority map and professional escalation | Facilities lead · QuarterlyEscalate: Condition changes rapidly or affects safety or water resistance |
| BuildingRoof condition uncertainty | Missing inspection history or repeated repairReview: Roof reports warranty files leak map invoices and photographs | Maintain inspection cadence warranty compliance and defect closure | Facilities lead · Semiannual and after major weatherEscalate: Active leak unsafe access or warranty-threatening delay |
| BuildingDrainage capacity concern | Ponding blockage erosion or overflow evidenceReview: Drainage inspections cleaning logs plans and storm observations | Clean verify and document critical drainage paths before wet season | Facilities lead · Monthly in wet seasonEscalate: Overflow threatens building access electrical systems or occupied space |
| MechanicalCritical pump failure | Alarm repeat fault or deferred repairReview: Alarm history run hours service logs and spare-parts status | Test duty and standby equipment document changeover and repair exceptions | Chief engineer · MonthlyEscalate: No functioning redundancy where required by property risk |
| MechanicalHVAC reliability decline | Rising complaints trips or temperature varianceReview: Work orders trend data service records and equipment condition | Use asset-level trend review preventive tasks and root-cause follow-up | Facilities lead · MonthlyEscalate: Critical area loses environmental control or repeat failure accelerates |
| MechanicalGenerator readiness gap | Failed test fuel concern or open deficiencyReview: Test logs fuel records load-bank reports and service tickets | Test to applicable requirements document results and close deficiencies | Facilities lead · MonthlyEscalate: Generator or transfer function fails a required test |
| MechanicalDomestic water interruption risk | Pressure complaints leak history or aging critical componentReview: Work orders valve map condition reports and vendor response plan | Maintain isolation map critical spares and interruption communication plan | Facilities lead · QuarterlyEscalate: Loss of service affects multiple areas or isolation is unknown |
| ElectricalElectrical room condition issue | Heat moisture clearance or labeling concernReview: Thermal reports walkthrough photos panel schedules and work orders | Keep rooms controlled dry accessible and professionally inspected as needed | Facilities lead · MonthlyEscalate: Heat moisture arcing odor or exposed hazard is observed |
| ElectricalSingle point of failure | No tested alternate path or spareReview: One-line diagrams asset inventory test records and contingency plan | Identify critical dependencies test contingency and maintain essential spares | Chief engineer · SemiannualEscalate: Failure would interrupt a life-safety or essential property service |
| OperationsPreventive maintenance backlog | Overdue critical tasks or rising emergency workReview: CMMS exports task standards asset list and exception report | Review overdue work by criticality cause owner and recovery date | Facilities lead · MonthlyEscalate: Critical task is overdue without accepted temporary control |
| OperationsRepeat work-order failure | Same issue returns after closureReview: Work-order history photographs resident reports and technician notes | Reopen by asset and cause require completion evidence and root-cause review | Property manager · MonthlyEscalate: Repeat issue affects safety habitability or material service |
| OperationsKnowledge concentrated in one person | Undocumented process or access dependencyReview: Procedure library access register interviews and coverage schedule | Document critical routines credentials ownership and backup coverage | Executive sponsor · QuarterlyEscalate: Departure or absence would stop a critical process |
| OperationsUncontrolled key or credential inventory | Missing issue record or shared credentialReview: Key log access-control report user list and termination checklist | Assign unique access review periodically and revoke promptly | Property manager · MonthlyEscalate: Lost credential provides material building or system access |
| VendorInsurance documentation lapse | Expired or incomplete evidenceReview: Certificates endorsements contract requirements and tracking log | Verify required evidence before work and through contract term | Contract owner · MonthlyEscalate: Vendor performs material work without required evidence |
| VendorScope delivery gap | Recurring missed task or weak evidenceReview: Contract scope service logs inspections complaints and invoices | Map each material obligation to evidence and corrective escalation | Contract owner · MonthlyEscalate: Material service remains missed after correction deadline |
| VendorVendor concentration risk | One provider controls multiple critical servicesReview: Vendor register spend analysis dependencies and alternatives | Identify concentration maintain alternatives and document transition requirements | Executive sponsor · QuarterlyEscalate: Provider distress or dispute threatens several critical services |
| VendorRenewal deadline exposure | Notice window approaching without reviewReview: Contract register renewal terms performance file and market options | Use a rolling calendar with named decision dates and evidence | Contract owner · MonthlyEscalate: Notice deadline is within the decision lead time without direction |
| FinanceUnexplained material variance | Variance persists without operational causeReview: Budget actuals commitments forecast and written explanations | Require owner cause impact forecast and corrective action for defined exceptions | Finance lead · MonthlyEscalate: Variance threatens cash service or approved priorities |
| FinanceCash visibility gap | Reconciliation or forecast is delayedReview: Bank reconciliations cash forecast aging and commitments | Maintain timely reconciliation short-term forecast and exception review | Finance lead · MonthlyEscalate: Available cash cannot be reconciled to near-term obligations |
| FinanceInvoice control weakness | Duplicate mismatch or unsupported approvalReview: Invoices purchase approvals contracts completion evidence and payment log | Separate initiation verification approval and release with exception checks | Finance lead · MonthlyEscalate: Payment lacks required approval or delivery evidence |
| FinanceReserve plan disconnect | Project timing and funding assumptions divergeReview: Reserve study project plan budget cash forecast and board decisions | Reconcile assumptions decisions and actual project changes | Board treasurer · QuarterlyEscalate: Known project or cost change materially affects the funding path |
| GovernanceDecision without adequate record | Motion omits basis authority or follow-upReview: Agenda packet minutes resolution and action register | Use decision briefs and record owner due date and completion evidence | Board secretary · Each meetingEscalate: Material action cannot be reconstructed from the record |
| GovernanceAction item stagnation | Overdue high-priority decisionReview: Action register status evidence and escalation notes | Review overdue items by impact blocker owner and revised date | Executive sponsor · MonthlyEscalate: Life-safety legal financial or service action misses a critical date |
| GovernanceConflict disclosure gap | Relationship or interest not documentedReview: Conflict policy disclosures minutes and procurement record | Obtain disclosure and apply the required review or recusal process | Board president · Per decisionEscalate: Potential conflict could affect a material decision |
| GovernanceRecords request breakdown | Unlogged delayed or incomplete responseReview: Request log source records response record and legal guidance | Centralize intake preserve source and track review production and closure | Records custodian · WeeklyEscalate: Deadline or preservation concern requires professional review |
| TechnologyUnauthorized access persistence | Former or changed-role user remains activeReview: User exports role matrix change records and access logs | Use unique accounts role-based access and prompt change control | System owner · MonthlyEscalate: Unknown or unauthorized access to sensitive or critical system appears |
| TechnologyBackup recovery uncertainty | Backup exists but restore is untestedReview: Backup logs retention settings restore tests and dependency map | Test restoration of critical records and document recovery responsibility | System owner · QuarterlyEscalate: Critical data cannot be restored within an accepted operating need |
| TechnologyVendor platform lock-in | Data export is incomplete or proprietaryReview: Contract export sample data dictionary and transition terms | Test usable exports and document ownership format and exit support | Executive sponsor · Annual and before renewalEscalate: Essential records cannot be exported in a usable format |
| PrivacySensitive data overcollection | Files contain unnecessary personal informationReview: Forms shared drives email samples access lists and retention rules | Collect minimum necessary restrict access and dispose under approved policy | Privacy owner · QuarterlyEscalate: Sensitive information is broadly accessible or sent through an unsuitable channel |
| ResilienceEmergency contact failure | Number role or vendor contact is outdatedReview: Call tree test results roster vendor contacts and escalation map | Verify contacts and alternates through a documented exercise | Property manager · QuarterlyEscalate: Critical contact cannot be reached during a test or event |
| ResilienceStorm preparation task gap | Readiness item has no owner or evidenceReview: Seasonal checklist vendor confirmations inventory and communication templates | Assign dates owners evidence and escalation for every critical task | Property manager · Monthly in seasonEscalate: Critical readiness task misses its last safe completion date |
| ResiliencePost-event documentation gap | Condition is altered before documentationReview: Timestamped photographs inspection route incident log and vendor reports | Use controlled assessment zones photo protocol and preservation rules | Incident lead · Per eventEscalate: Repair or cleanup begins before material conditions are documented |
| ProjectsScope ambiguity | Proposal assumptions differ or exclusions are unclearReview: Scope documents drawings proposals clarifications and meeting record | Issue one controlled scope and resolve assumptions before award | Project sponsor · At each stageEscalate: Bids cannot be compared on a common basis |
| ProjectsChange-order growth | Changes rise without cause analysisReview: Change log instructions pricing schedule and approval record | Classify cause verify authority assess time and cost before approval | Project sponsor · MonthlyEscalate: Unapproved work or cumulative change exceeds approved tolerance |
| ProjectsSchedule slippage | Milestone misses lack recovery pathReview: Baseline schedule updates constraints meeting minutes and notices | Require cause impact recovery owner and revised evidence | Project sponsor · MonthlyEscalate: Critical path or occupancy impact changes materially |
| ProjectsCloseout incompleteness | Final payment approaches before records are completeReview: Punch list warranties permits training manuals and final releases | Tie completion and payment to a controlled closeout register | Project sponsor · Weekly at closeoutEscalate: Required approval warranty or life-safety record is missing |
| Life safetyEmergency lighting failure | Failed test or unresolved fixture defectReview: Test log work orders inspection record and correction photographs | Test at an assigned cadence and verify correction before closure | Facilities lead · Monthly and after outageEscalate: Required route lighting fails or testing is overdue |
| Life safetyStairwell door closure gap | Door fails to close latch or release as intendedReview: Door inspection record service ticket and recheck | Inspect critical doors and document specialist repair and retest | Facilities lead · MonthlyEscalate: Life-safety door defect remains open |
| BuildingBalcony condition follow-up | Open professional finding or worsening observed conditionReview: Inspection report restriction map photographs and repair plan | Track each finding restriction owner and verification milestone | Project sponsor · Monthly until closedEscalate: Restricted element is used or condition changes |
| BuildingExpansion joint water path | Recurring moisture near movement jointReview: Leak map photographs test findings and repair history | Locate source and monitor repair performance with qualified input | Facilities lead · Quarterly and after heavy rainEscalate: Water reaches occupied or critical area |
| BuildingFacade attachment concern | Loose component or repeated attachment defectReview: Inspection findings photographs and specialist recommendation | Restrict affected area and obtain qualified assessment | Property manager · Per observationEscalate: Falling-object or access hazard is suspected |
| MechanicalWater treatment lapse | Treatment report missing or out-of-range trendReview: Service reports readings maintenance history and corrective actions | Assign review of treatment evidence and verify exception closure | Facilities lead · MonthlyEscalate: Critical system condition is outside accepted range |
| MechanicalElevator service backlog | Open callbacks and overdue corrective workReview: Callback log inspection record and vendor plan | Prioritize repeat faults and verify work with service evidence | Property manager · MonthlyEscalate: Reliability or safety concern persists without a plan |
| ElectricalGenerator fuel continuity gap | Fuel level or delivery arrangement unverifiedReview: Fuel logs vendor agreement exercise record and forecast | Confirm supply trigger backup contact and test evidence | Facilities lead · Before storm season and monthlyEscalate: Expected runtime cannot be supported |
| ElectricalElectrical load change uncertainty | Added equipment lacks documented capacity reviewReview: Panel schedules project records and professional review | Require qualified load review before material additions | Project sponsor · At each material changeEscalate: Capacity or protection is uncertain |
| OperationsAsset register drift | Installed asset lacks owner location or service planReview: Asset inventory drawings work orders and turnover files | Reconcile installed assets with maintenance and warranty records | Facilities lead · QuarterlyEscalate: Critical asset is absent from the register |
| OperationsResident issue recurrence | Same issue reopens after closureReview: Ticket history resident messages and inspection evidence | Track repeat causes and verify correction with affected users | Property manager · MonthlyEscalate: Repeated issue affects service or safety |
| OperationsInspection follow-up delay | Finding has no assigned due date or completion proofReview: Inspection report action log and closeout evidence | Assign one owner and escalate overdue material findings | Property manager · WeeklyEscalate: Critical finding passes its safe response window |
| VendorSubcontractor visibility gap | Unknown subcontractor performs critical workReview: Approved roster qualifications access logs and work records | Require named subcontractors and verify role and coverage | Contract owner · At mobilization and quarterlyEscalate: Unapproved party performs restricted work |
| VendorEmergency rate ambiguity | Callout price or authority is unclearReview: Executed rate schedule emergency scope and approval policy | Agree trigger rate and documentation before an event | Contract owner · Before storm seasonEscalate: Emergency work begins without agreed commercial terms |
| FinanceAssessment receivable trend | Aging balance grows without explanationReview: Aging report budget cash forecast and collection policy | Trend aging with qualified finance guidance and cash impact | Treasurer · MonthlyEscalate: Collection trend threatens planned commitments |
| FinanceUnrecorded commitment exposure | Work directed before cost approval or purchase recordReview: Work orders approvals contract and invoice sequence | Record authority and forecast every material commitment | Treasurer · MonthlyEscalate: Commitment exceeds delegated authority |
| GovernanceBoard packet evidence gap | Decision request lacks source or alternativesReview: Packet checklist source index and meeting record | Require concise decision brief with verified facts and open questions | Board secretary · Each meetingEscalate: Material approval is sought without evidence |
| ResilienceFlood barrier deployment uncertainty | Barrier components or roles are untestedReview: Inventory deployment plan exercise and inspection evidence | Test installation readiness and assign backup roles | Incident lead · Before storm seasonEscalate: Barrier cannot be deployed by the last safe window |
| ResilienceRe-entry decision ambiguity | Access resumes without verified conditionsReview: Official notices site assessment and communication record | Define qualified clearance and communication authority | Incident lead · Per eventEscalate: People may enter an unsafe area |
| ProjectsPermit milestone gap | Work advances without current permit statusReview: Permit log inspection requests and schedule update | Tie construction sequence to required approvals | Project sponsor · Weekly during workEscalate: Inspection or approval blocks safe progress |
Do not hide urgency inside a single color.
A numeric score supports comparison but should not override life-safety obligations, legal requirements, professional direction, or an imminent loss of a safe decision window.
Show movement, not just status.
For each material item, report the change since the last review, new evidence, treatment progress, blocked action, current owner, next decision, due date, and residual uncertainty.
Keep the executive register concise. Detailed technical findings remain in their source records. The board view should make it possible to see what became more urgent, what control failed, what action slipped, and what authority or resource is now required.
Minimum decision brief
- Risk statement: cause, event, consequence
- Evidence date: what is known and when verified
- Control status: effective, partial, failed, or untested
- Treatment: action, owner, target, dependency
- Decision: approval, direction, funding, or specialist input
- Trigger: condition requiring immediate escalation
Build a controlled local register.
The CSV provides risk prompts, leading indicators, evidence, baseline controls, ownership suggestions, cadence, and escalation triggers. Add local identifiers, source links, assessment dates, treatment actions, accountable names, target dates, residual rating, and closure evidence.
Keep sensitive building, resident, security, insurance, and access information in an appropriately controlled system. The public template should not become the storage location for confidential facts.
Available format
CSV61 rows · spreadsheet-readyVersion September 23, 2026 · UTF-8 · oversight framework, not professional risk adviceProperty risk register questions.
What should a property risk register contain?
Record the cause, risk event, potential impact, leading indicators, evidence, existing controls, control confidence, owner, review date, treatment action, target date, escalation trigger, and residual uncertainty. Link to source records instead of copying sensitive details into the board view.
How often should a condominium risk register be reviewed?
Review material operating risks at least monthly, critical exceptions as they occur, and the complete register at a planned quarterly or annual governance review. Reassess after incidents, inspections, projects, storms, claims, system changes, or leadership transitions.
Does a risk register replace professional inspections?
No. It organizes oversight and follow-through. Qualified legal, engineering, life-safety, insurance, accounting, environmental, and other specialists remain necessary for property-specific requirements and decisions.